Previous Thread
Next Thread
Print Thread
Rate Thread
#12655 08/25/07 03:52 AM
Joined: May 2006
Posts: 8
B
Member
Member
B Offline
Joined: May 2006
Posts: 8
I have a question on anchoring my post to my basement.


I already have my floor joist and sub-flooring in place, I was going to have steel plate sitting of the floor with a steel rod (prob. 1"diaX18"length) going through my flooring down anchored to the foundation, and a steel plate attached to my post. Once in place, just weld the two plates together. There will be blocking under the post also (Would kiln dried 2x10 work?) Do you have any other suggestions or concerns?
I already have my anchor plates for the bottom of timbers.
I'm trying to make this as easy process as possible while the timbers are being set.

Thanks

Joined: Feb 2006
Posts: 74
T
Member
Member
T Offline
Joined: Feb 2006
Posts: 74
Sounds like a pretty clever solution. If you have the technology, then welding can work for you. I wouldn't think you would necessarily need blocking under the post, but it could come in handy for getting the height exactly right.

I used a plasma cutter to punch holes in my stainless post straps, once I discovered that you can't drill holes thru 3/16 stainless very easily! I have a few scorch marks on my post bottoms. (OK, I admit, some were on fire for a brief moment.) In short, be careful welding next to your timbers. They can catch on fire, but they'll probably self-extinguish. smile

Do you play bluegrass or just like to listen to it?

-Thomas (in the bluegrass state)


Moderated by  Jim Rogers, mdfinc 

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 8.0.1
(Release build 20251126)
Responsive Width:

PHP: 8.3.33 Page Time: 0.027s Queries: 19 (0.014s) Memory: 2.9656 MB (Peak: 3.5620 MB) Data Comp: Off Server Time: 2026-09-16 19:41:31 UTC
Valid HTML 5 and Valid CSS