I am building a Timber Frame about 2700sq Ft with a fairly simple roof design.It has an unfinished basement and is like a walk-out rancher.We are using an in-floor heat system and the finishing is basic 1x6 and 1x4 for base and door casing.We have a real wood burning fire place with granite facing.With this brief desciption can someone give me an idea how long this might take to complete after the timber raising.I would hire trades as needed,and materials would be available as needed.If all went as planned without too many changes or delays,what might be an average time frame? smile jaydallamore@shaw.ca