Previous Thread
Next Thread
Print Thread
Rate Thread
Page 2 of 2 1 2
Mark Davidson #12636 08/24/07 03:15 AM
Joined: Jan 2007
Posts: 217
D
Member
Member
D Offline
Joined: Jan 2007
Posts: 217
This is from the ILBA standards for log construction,


2.J. Kerfing
2.J.1. The kerf is usually, though not always, a cut made with a chainsaw.
Logs are known to check, or crack, in those places where wood has
been removed closest to the pith, (or the center) of the log. Kerfing is therefore an effective way to control the location of checks as green logs dry.
Because dry logs already have seasoning checks, kerfing usually will not change the location of checks, and therefore kerfing is not required for dry logs.
2.J.2. The kerf must be deep enough to promote checking. Note that even those long groove profiles that do not require kerfing (like the double-cut) are nevertheless required to be the depth of at least onequarter of the diameter of the log at every point along the top of the log. (See also Section 2.D.5.)
After a log has both the kerf and the long groove cut, there must still be at least one-half of the diameter of the log remaining un-cut. Removing more than half the diameter of the log for kerf and groove combined would weaken the log, and so should be avoided.

Don P #12668 08/26/07 08:21 PM
Joined: Dec 2005
Posts: 574
T
Member
Member
T Offline
Joined: Dec 2005
Posts: 574
Sweet.
Thanks smile

Page 2 of 2 1 2

Moderated by  Jim Rogers, mdfinc 

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 8.0.1
(Release build 20251126)
Responsive Width:

PHP: 8.3.33 Page Time: 0.030s Queries: 19 (0.014s) Memory: 2.9860 MB (Peak: 3.5625 MB) Data Comp: Off Server Time: 2026-09-16 22:07:38 UTC
Valid HTML 5 and Valid CSS