Hi, Im looking into a property with the idea of building a about 1500 s/f timber frame.
It has a compleated 8" concrete foundation(new), but it was not built specificly for a T/F home. Is it possible to modify in some way. I.e bolting tie down straps to the concrete or some such things? Could the main floor be built to distribute the point loads a little better? Any help, thanks