good day

the second plate made two walls, an inter which was straping, the outer wall had vents from the 2nd floor about 3 ft up along both side of the corn barn. We think to dry the corn.

i learned alot from this barn like

every side board was a lap joint on top and bottom with a 45 dag bevel at the top so any water would shed away.

all the clap boards were over laped 4 to 6 in. insted of just butted agenst each other.

get the hewing thing down

heath enright
pine grove hewing co


heath enright