I am in the same position as Joel and have similar questions.
It was mentioned to leave a space between the exterior wall and the frame to slide the sheet rock in. Should a slightly larger space be left, say 1/8" more than the sheet rock thickness, or should the spacer be the same thickness as the sheet rock?