I would like to acquire the red oak (green) and slowly peck away at cutting the joints as free time will allow. I heard that red oak is "different" and does not need to sit for the typical 6 weeks before any cutting. Is this true? I could cut immediately? If so, should I cut 1 tiber (all joints) at a time? Or better to cut only "mating" joints, or only the tenons, or only mortises? Do not want to cause a shrinkage mismatch here. Looking for some guidance. Thanx.

Joined: Nov 2003
Posts: 1,124
M
Member
Member
M Offline
Joined: Nov 2003
Posts: 1,124
what kind of time period are we talking here?
I would tend to cut the timbers at one time, then perhaps you could save cutting the tenons till the end, as they will dry faster than the mortices.


Moderated by  Jim Rogers, mdfinc 

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 8.0.1
(Release build 20251126)
Responsive Width:

PHP: 8.3.33 Page Time: 0.027s Queries: 18 (0.015s) Memory: 2.9626 MB (Peak: 3.5600 MB) Data Comp: Off Server Time: 2026-09-17 01:57:55 UTC
Valid HTML 5 and Valid CSS