Previous Thread
Next Thread
Print Thread
Rate Thread
#1771 07/22/05 05:22 PM
Joined: Jan 2005
Posts: 27
M
Member
Member
M Offline
Joined: Jan 2005
Posts: 27
We Just raised a frame in EWP. There is no finish and the surface is hand planed. After cleaning up the frame with a plane, my client wants to know how long till the patina blends in. The frame is enclosed, no longer exposed to the sun. The original planing took place within 2 to 4 weeks of the touch up planing. Any ideas on how long this process takes. Thanks Mike

#1772 07/23/05 12:52 AM
Joined: May 2002
Posts: 218
E
Member
Member
E Offline
Joined: May 2002
Posts: 218
Left on it's own out of the sun, many months.
Temperature and amabient humidity will have some effect.
The process can be slowed even more with a wiping oil but you have to buy the minor color change in the process.
work safe , have fun.


Moderated by  Jim Rogers, mdfinc 

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 8.0.1
(Release build 20251126)
Responsive Width:

PHP: 8.3.33 Page Time: 0.021s Queries: 18 (0.009s) Memory: 2.9643 MB (Peak: 3.5630 MB) Data Comp: Off Server Time: 2026-09-16 21:09:26 UTC
Valid HTML 5 and Valid CSS