I obtained the tfg 34,35 and 36 introduction to french scribe quite some time ago. A few questions occured to me from where the third installment leaves off. Can anyone help please?

Am I right in thinking that when you have established your "axes des assemblages" that you use them as references from which to measure your mortise and tenon positions? (as well as initially to enable you to align your timbers on an imaginary horizontal plane parralel to the drawing surface of the floor plan)?

Are mortises and tenons generally in the centre of posts or beams?

Am I right in thinking that you should only need to align the timbers once, and that the "picage" stage should be fairly quick.

If you have to make say 6 trusses, would you align and picage each one from the same original floor plan, instead of using the first completed truss as a pattern?

Cheers Jonathan

#2011 10/05/05 01:03 PM
Joined: Oct 2002
Posts: 209
Member
Member
Joined: Oct 2002
Posts: 209
Soem answers for you:

Am I right in thinking that when you have established your "axes des assemblages" that you use them as references from which to measure your mortise and tenon positions?
Not really. The mortises and tenons are laid out on the timbers, not on the floor drawing, which only shows intersections of principle axes.

(as well as initially to enable you to align your timbers on an imaginary horizontal plane parralel to the drawing surface of the floor plan)?
A vertical plane, plumb over the drawing. You still need to level the timbers to get them parallel to the floor drawing.

Are mortises and tenons generally in the centre of posts or beams?
Yes, but not always.

Am I right in thinking that you should only need to align the timbers once, and that the "picage" stage should be fairly quick.
Oui.

If you have to make say 6 trusses, would you align and picage each one from the same original floor plan, instead of using the first completed truss as a pattern?
Definitely; that's the point. The 1st truss could be wonky.

#2012 10/05/05 04:04 PM
Joined: Sep 2005
Posts: 30
H
Member
Member
H Offline
Joined: Sep 2005
Posts: 30
Thanks for your reply Will smile

From my understanding of the tfg articles 34,35 & 36, the axes des assemblages are imaginary (or "virtual") planes set on the timber, not the floor drawing. I realise you dont need to draw m&t positions on the floor plan either BUT if you arent using the axes des assemblages as a reference to set out your m&t's on the timber to get them to line up from component to component etc, then what do you or should you be using? How is that stage done? confused
Cheers, Jonathan


Moderated by  Jim Rogers, mdfinc 

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 8.0.1
(Release build 20251126)
Responsive Width:

PHP: 8.3.33 Page Time: 0.030s Queries: 20 (0.016s) Memory: 2.9718 MB (Peak: 3.5630 MB) Data Comp: Off Server Time: 2026-09-16 19:25:40 UTC
Valid HTML 5 and Valid CSS