We are erecting a frame on a concrete slab that is uneven, what is your preferred method for leveling the frame? Do you cut your posts so that the tops are all even or do you use shims to even things up? The difference between the highest point and the lowest point on the slab where the posts sit is about 1- 1/4". Thanks for any comments or suggestions.

Harry