Originally Posted By: bmike
Originally Posted By: Thane O'Dell
You would think that if a check runs vertically through the center of an 8x8 beam then you would have two 4x8 beams with the same strength as an 8x8.
I may also sticking my neck out.


You never have the same strength when piecing 2 beams together. See Ben B's recent article in the TF journal on keyed beams.


Ben B and Firetower have a presenation up at their site.
http://www.ftet.biz/index.php?action=resources.vwp2

Here's another link to the white paper for the engineering geeks:
http://www.ftet.biz/index.php?action=resources.wp01


Mike Beganyi Design and Consulting, LLC.
www.mikebeganyi.com