Previous Thread
Next Thread
Print Thread
Rate Thread
Page 3 of 3 1 2 3
Joined: Aug 2006
Posts: 242
T
Member
Member
T Offline
Joined: Aug 2006
Posts: 242
Nh. The problem I have with the technique you described is that, when I hew, the ground is almost always frozen solid and mostly rock. to trench down the bunk logs without machinery is probably even more difficult than these other techniques I am pursuing. Most of the time I would fell a tree, buck it and try to position the setup so there would be very little moving of the log to be hewn, as they are heavy and I dont have heavy machinery or assistance. This scenario puts me in a position where I need to be able to do a new setup quickly and at a new fell site each time. tb

Joined: Mar 2002
Posts: 1,199
N
Member
Member
N Offline
Joined: Mar 2002
Posts: 1,199
Hi TB

I guess that would create a different approach to the setup proceedure, I should have realized that different areas create different problems, I was always hewing in the summer months and had created a hewing area that was fairly free of rocks which was a normal proceedure in the days gone by.

NH

Page 3 of 3 1 2 3

Moderated by  Jim Rogers, mdfinc 

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 8.0.1
(Release build 20251126)
Responsive Width:

PHP: 8.3.33 Page Time: 0.035s Queries: 19 (0.017s) Memory: 2.9862 MB (Peak: 3.5631 MB) Data Comp: Off Server Time: 2026-09-17 01:07:46 UTC
Valid HTML 5 and Valid CSS