Just to clarify: I would have braces on both sides. Customer wants no braces. He doesn't want to "waste" money on an engineer.
I won't put it up without a stamp. I'll pay the engineer out of the job contingency fund. Just wanted to know if there was a way around using braces. Can we agree that with a steep brace at each end this should work?