Try to keep penetrations to a minimum - or work to have blocking installed as Jim describes. I'm a fan of half timbers @ the wall - you still need to lag these to the SIPs - but the loads are contained with the timbers themselves and the lag / bolts help with shear / etc.


Mike Beganyi Design and Consulting, LLC.
www.mikebeganyi.com