My nderstanding is that the perimeter of the foundation is 16" deep and 10" wide tapered back to 5" within 2 feet of the edge all around the perimeter. Rebar is then placed in the edge. I am not sure what a monitot roof is? I will have a louvered opening in the roof for steam release.