Has anybody had any experience installing 3x6 double t&g DF roof decking? I'm hearing it's quite the job as it requires 8" spikes every 30" horizontally through one board into the one behind it as well as 4" nails diagonally thru the top tongue and one straight in at the back. I have a job with 2200 sq/ft to cover. Any hints? Thanks