Jamey,
Think about pulling that ledge out a bit, so you don't have to remove so much material from the posts. Here's how we are doing it down at the upcoming Frankfort Kentucky project:
We are using 8x8 queen posts necked down to 6x8 above the lower purlin, so the purlin has a 2" shelf to sit on. Screws from the outside face secure the lap.
