Previous Thread
Next Thread
Print Thread
Rate Thread
Joined: Mar 2013
Posts: 2
L
Member
Member
L Offline
Joined: Mar 2013
Posts: 2
Hello, I am designing an 8' wide 50' span pedestrian bridge linking parking lots with a hotel and ski lift over a small ravine. I am looking for an engineer or a list of qualified engineers who I could contact and work with on this bridge.
I really want to build a fully covered queen post truss bridge, but my clients have insisted on first presenting them with the least expensive option. So I am in the process of designing a pressure treated timber, uncovered, queen post truss with lots of steel plates and galvanized bolts. Maybe two steel I-beams would be even cheaper? I hate designing the cheapest option.
Any advice would be welcomed. thank you.

Joined: Nov 2008
Posts: 582
Member
Member
Joined: Nov 2008
Posts: 582
Call Ben and "Fire Tower Engineers,"

Joined: Jan 2008
Posts: 918
B
Member
Member
B Offline
Joined: Jan 2008
Posts: 918
Going to be hard pressed to beat a couple of large steel beams and a wood deck or pre fab concrete deck. But wood could be beautiful.

Ben would be a good choice. You can also go to the TFEC timber frame engineering council website and find an engineer in your region.


Mike Beganyi Design and Consulting, LLC.
www.mikebeganyi.com
Joined: Aug 2012
Posts: 26
W
Member
Member
W Offline
Joined: Aug 2012
Posts: 26
Good advice from all here on where to look for such help -

As an aside, just because it is something that needs to be part of your tangential planning. Do know that ever since the Minneapolis collapse few carriers (you can count them on one hand - your current insurer is not likely to be one of them) will write GL policies for those doing bridge work, and you will pay a larger premium for the privilege, and there is no walking away from it once it is part of the record. The way they look at it, even your past work carries a potential liability should something someday go sideways and the lawsuits were to start flying.

Just a heads up that you would / should need to build that future cost even into a one off effort.


Moderated by  Jim Rogers, mdfinc 

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 8.0.1
(Release build 20251126)
Responsive Width:

PHP: 8.3.33 Page Time: 0.030s Queries: 23 (0.015s) Memory: 2.9780 MB (Peak: 3.5620 MB) Data Comp: Off Server Time: 2026-09-16 22:39:13 UTC
Valid HTML 5 and Valid CSS