Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 3 1 2 3
#32063 02/24/14 10:05 PM
Joined: Feb 2006
Posts: 718
Member
Member
Joined: Feb 2006
Posts: 718
I'm cutting pine for a few frames this winter. Just got the skid road finished yesterday, and started cutting the first trees today. There is some nice pine at my neighbors, and I'm skidding it right to my mill. 30'x22" Easten White Pine.



Member, Timber Framers Guild
Joined: Mar 2002
Posts: 1,696
J
Member
Member
J Online: Confused
Joined: Mar 2002
Posts: 1,696
Nice looking stick. Thanks for posting.


Whatever you do, have fun doing it!
Joined: Dec 2007
Posts: 1,882
T
Member
Member
T Offline
Joined: Dec 2007
Posts: 1,882
Hi Dave, I am assuming you are cutting by hand? That is a sweet piece of pine. I am hashing over some tree length stuff picking and choosing the cuts, nothing like that, though! You must have extensions for your mill?

Joined: Feb 2006
Posts: 718
Member
Member
Joined: Feb 2006
Posts: 718
All hand falling for me. That's a medium sized stick. I've got a few logs on this job that will make 40'x24". Sadly, I don't have a use for timbers that big right now, so they will become something much shorter. I have a 24' extension for the Wood-Mizer. I can saw 45' in one pass, but have done 47'


Member, Timber Framers Guild
Joined: May 2010
Posts: 946
Member
Member
Joined: May 2010
Posts: 946
How wonderful it would be to have sticks like that in Indiana...

Sometimes I think I need to move somewhere with trees like you have!

Wind and record cold and record snowfall has held off logging this winter around here -no one wanted to go out their door!)


Was de eine ilüchtet isch für angeri villech nid so klar.
http://riegelbau.wordpress.com/
Joined: Nov 2003
Posts: 687
G
Member
Member
G Offline
Joined: Nov 2003
Posts: 687
Wow -- nice stick. Don't break the mill!


It's been pretty wet down here this winter-- not a lot of stuff making it out of the woods.

We don't cut too much anymore, but I hope to get a half dozen or so good yellow pines down from a house site in order to use them in the frame -- they have to come down anyway so it would be a shame not to use them. I'd really like to get them down and sawn up before the sap rises, but we're running out of time. Maybe I should shift priorities...

Joined: Dec 2007
Posts: 1,882
T
Member
Member
T Offline
Joined: Dec 2007
Posts: 1,882
If you get shifting priorities figured out, let us know how that went. Still working on that one.

Joined: Feb 2006
Posts: 718
Member
Member
Joined: Feb 2006
Posts: 718
The mill won't have any problem with that little guy. I've had some bigger stuff on there before:



Member, Timber Framers Guild
Joined: Nov 2003
Posts: 687
G
Member
Member
G Offline
Joined: Nov 2003
Posts: 687
We always seem to break something -- cylinder/hose, bend the clamp, etc -- when we saw the big boys. Usually its when we're rolling or loading.

Joined: Feb 2006
Posts: 718
Member
Member
Joined: Feb 2006
Posts: 718
I bent a guide roller holder on one of those big ones. I was able to straighten and weld it to keep going, but it got replaced. There are no hydraulics on the extension, so I used a Lull forklift for all maneuvering on the long ones. That one is over 47 feet, which is longer than I can saw, so there was still a lot of sliding to get it done.


Member, Timber Framers Guild
Page 1 of 3 1 2 3

Moderated by  Jim Rogers, mdfinc 

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 8.0.1
(Release build 20251126)
Responsive Width:

PHP: 8.3.33 Page Time: 0.037s Queries: 36 (0.016s) Memory: 3.0324 MB (Peak: 3.5629 MB) Data Comp: Off Server Time: 2026-09-16 15:36:40 UTC
Valid HTML 5 and Valid CSS