So if I understand correctly - the notched purlins bearing on the bent/frame has been reduced to a depth of 4" even though the purlins structural required depth has been say calculated to be 6", my understanding of structural engineering is limited could you explain to me why if a purlin which needs a 6" depth between supports can be reduced to 4" at the bearing points?