Previous Thread
Next Thread
Print Thread
Rate Thread
Green or dry timber? #7460 02/13/02 06:56 PM
A
Anonymous
Unregistered
Anonymous
Unregistered
A
I'm planning to build a smallish shed (15' x 21') framed with hemlock timbers (mostly 6"x6") on 3' centers. I will mortise and tenon the timbers by hand.

The local mill will furnish the rough-sawn hemlock to me green, still dripping. My question is: is it better to cut and fit the hemlock timbers while they are still green and wet? Or is it better to sticker the timbers up, cover them, and let them air-dry for four to six months, and then cut and fit the timbers after drying?

Thanks for your advice/guidance.

Re: Green or dry timber? #7461 02/13/02 09:32 PM
A
Anonymous
Unregistered
Anonymous
Unregistered
A
A lot of timber frames are cut green. The drier the wood the harder it gets. If time permits start as soon as you can. Good Luck, Jim

Re: Green or dry timber? #7462 02/13/02 11:01 PM
Joined: Mar 2002
Posts: 21
J
jekbear Offline
Member
Offline
Member
J
Joined: Mar 2002
Posts: 21
I concur with Jim. I waited to start the joinery for 6 weeks from the time the sawyer cut the logs. This was his recommendation. He claimed that most of the twist and bow that was going to occur would happen during that time. I don't know if that is true or not as there was very little change in the beams (mostly 8x8s)even after 14 months. I also was using hemlock and I started the cutting in December. I haven't worked that much with other species, but with hemlock, the wetter it is, the easier it is to cut, especially when cross-grain paring. Good luck, jekbear


Moderated by  Jim Rogers, mdfinc 

Newest Members
Bradyhas1, cpgoody, James_Fargeaux, HFT, Wrongthinker
5137 Registered Users
Powered by UBB.threads™ PHP Forum Software 7.7.3
(Release build 20190728)
PHP: 5.4.45 Page Time: 0.042s Queries: 14 (0.006s) Memory: 3.1159 MB (Peak: 3.5814 MB) Data Comp: Off Server Time: 2024-04-19 21:09:37 UTC
Valid HTML 5 and Valid CSS