Previous Thread
Next Thread
Print Thread
Rate Thread
Page 3 of 3 1 2 3
Re: Estimating joinery time [Re: Kevin L] #18916 03/31/09 11:30 AM
Joined: Dec 2007
Posts: 1,882
T
TIMBEAL Offline
Member
Offline
Member
T
Joined: Dec 2007
Posts: 1,882
Interesting point, Kevin. This may be true, in some regards. Things seem to really fly with four guys in the shop, though. It could be the banter exchanged with others, when present. This doesn't happen when alone, most of the time.

Tim

Re: Estimating joinery time [Re: TIMBEAL] #18933 04/01/09 11:00 AM
Joined: Dec 2007
Posts: 1,882
T
TIMBEAL Offline
Member
Offline
Member
T
Joined: Dec 2007
Posts: 1,882
In regard to my previous post on volume of wood removed, I was cutting some large through tenons yesterday and that would be some gravy working piece meal, so I was thinking mortices could have a different rate than tenons, or not, think of it as a bonus. Hopefully some Attorney General won't take it back after the fact.

Tim

Re: Estimating joinery time [Re: Shaun Garvey] #18940 04/01/09 02:52 PM
Joined: Jan 2008
Posts: 918
B
bmike Offline
Member
Offline
Member
B
Joined: Jan 2008
Posts: 918
An interesting side note to this is that with the dynamic components in SketchUp 7 you can assign variables of all sorts to your joinery (and timbers, pretty much anything). When you use the 'report' feature you can break out the joinery from the timber (and sips, trim, floors, etc.) If you were crafty enough you could write statements into your joints - so a tenon of a certain size would be equal to X $$$ and a tenon of a different size would be equal to $$ (this would have to include the mortise and housing + the tenon).

Of course, this is probably overkill for the first 5 frames or so - but once you build it, anytime you pull a joint from your library - that data is embedded in it (or to simplify, you could just assign a value - like 'J2' for medium difficulty, and 'J3' for harder, etc. or by type... - then do a 'gut' check on your output and throw a number at it).


But, its all theory until you understand what you can cut in an hour, per man, then figure out your shop rate, per man, per hour. And break it down from there. And don't forget to add your burdens to it - rent, profit margin, benefits, taxes, rainy day fund, donut fund, medical, etc. etc.

Spreadsheets. Mmmm.


Mike Beganyi Design and Consulting, LLC.
www.mikebeganyi.com
Page 3 of 3 1 2 3

Moderated by  Jim Rogers, mdfinc 

Newest Members
Bradyhas1, cpgoody, James_Fargeaux, HFT, Wrongthinker
5137 Registered Users
Powered by UBB.threads™ PHP Forum Software 7.7.3
(Release build 20190728)
PHP: 5.4.45 Page Time: 0.294s Queries: 15 (0.018s) Memory: 3.1556 MB (Peak: 3.5815 MB) Data Comp: Off Server Time: 2024-04-29 00:35:10 UTC
Valid HTML 5 and Valid CSS