Previous Thread
Next Thread
Print Thread
Rate Thread
Page 3 of 3 1 2 3
Re: Equipment Shed Nears Completion #25118 01/10/11 02:39 PM
Joined: Nov 2009
Posts: 80
Kevin Rose Offline OP
Member
OP Offline
Member
Joined: Nov 2009
Posts: 80
The building is 20' x 30', based on 10' bays. At the gable peak it's 14'. (ceiling height in the loft is about 5' at the peak) The rafters are 4x6 on 33" centers and the roofing is standard 26 gauge "Imperial Rib" galvalume (ABC) fastened to 2x4 roof purlins spaced at 22". All the wood (frame and siding) is hemlock.

The building is set on rebar reinforced concrete piers (5' deep, including footing). I set j-bolts into the tops of the piers at the 10' centers, extending to a height of about 4" above the pier. Steel straps (with a short piece of rebar at the base in a T configuration) were also set into the tops of the pier (one per pier), offset from center to extend up the side of the timber post. The j-bolt (set into holes drilled into the post base) resists horizontal movement and the straps hold it vertically. The floor is a sand/gravel base covered with roadway fabric then 6" of "sure pack" (crushed stone with fines).

Best,
~ Kevin


~Kevin Rose
Northern Vermont
Re: Equipment Shed Nears Completion #25131 01/11/11 11:56 PM
Joined: Oct 2010
Posts: 8
C
chip Offline
Member
Offline
Member
C
Joined: Oct 2010
Posts: 8
Thanks for posting the details on the equipment shed!

Page 3 of 3 1 2 3

Moderated by  Jim Rogers, mdfinc 

Newest Members
Bradyhas1, cpgoody, James_Fargeaux, HFT, Wrongthinker
5137 Registered Users
Powered by UBB.threads™ PHP Forum Software 7.7.3
(Release build 20190728)
PHP: 5.4.45 Page Time: 0.029s Queries: 15 (0.010s) Memory: 3.1451 MB (Peak: 3.5814 MB) Data Comp: Off Server Time: 2024-05-03 15:46:35 UTC
Valid HTML 5 and Valid CSS