splicing beams
#29208
06/17/12 02:17 PM
|
Joined: Jun 2012
Posts: 2
Cory
OP
Member
|
OP
Member
Joined: Jun 2012
Posts: 2 |
Hi, I'm new to construction but am trying to build a timber framed garage. I have 6x6 posts and 6x10 beams which I need to join over the posts. I was thinking a lap joint. What is the easiest joint to make over the post and what length should each lap be? Should the joint be directly over the post or should it carry over beyond the post? Any diagram or photo would greatly help. Thank you.
|
|
|
Re: splicing beams
[Re: Roger W Nair]
#29215
06/18/12 04:06 PM
|
Joined: Jun 2012
Posts: 2
Cory
OP
Member
|
OP
Member
Joined: Jun 2012
Posts: 2 |
Thank you. I have a timber framing book by Jack Sobon which has been very helpful. I guess I'm not trying to actually splice a beam but rather join two beams over a post and am looking for the easiest way to do it. I was going to do a lap joint in the beams over each post. I was looking for a diagram or measuremnent of where the joint placement should be. I know I should have each beam resting on the post but how many inches of beam should be supported by the post? If I just butted them up together I would have 3" of each beam on a post. With a lap joint how big should the laps be? Should each lap be 3"? I hope this isn't written to be too confusing?
|
|
|
Re: splicing beams
[Re: Cory]
#29216
06/18/12 07:53 PM
|
Joined: Jan 2008
Posts: 918
bmike
Member
|
Member
Joined: Jan 2008
Posts: 918 |
Cory, This is what we are doing at an upcoming TFG workshop. Whatever solution you choose, you need to make sure it works for your design loads, brace locations, etc. If you have any questions you should find an engineer or local timber framer to guide you through the process. -Mike
Last edited by bmike; 06/18/12 07:54 PM.
|
|
|
Re: splicing beams
[Re: bmike]
#29217
06/18/12 09:15 PM
|
Joined: Mar 2002
Posts: 1,687
Jim Rogers
Member
|
Member
Joined: Mar 2002
Posts: 1,687 |
Cory: You need to understand the load being put on the beams. And that when you cut a lap you are cutting away half the beam where you need it to be the strongest. This is not good.
Read Jack's book again and make a scarf off to the side of the post not directly over it.
The scarf can be/maybe a simple half lap, if there is no tension in the beams.
As mentioned have an engineer or someone else look over the entire design to make sure you doing something safe.
Jim Rogers
Whatever you do, have fun doing it!
|
|
|
Re: splicing beams
[Re: Jim Rogers]
#29565
08/28/12 03:19 AM
|
Joined: Dec 2002
Posts: 94
jim haslip
Member
|
Member
Joined: Dec 2002
Posts: 94 |
The expression "quarter-point" comes to mind on this issue. Carpenters often make joints in a built-up beam assembly one quarter of the distance between supporting points because this is where deflection and shear are typically "minimal" or greatly reduced from the measurements found at the supporting points themselves.
|
|
|
Re: splicing beams
[Re: jim haslip]
#29679
10/02/12 05:31 AM
|
Joined: Jun 2009
Posts: 19
BTF
Member
|
Member
Joined: Jun 2009
Posts: 19 |
I've quarter pointed many beams, but they always have another ply spanning the full span of the beam section with the quarter pointed ply supported by one end and at least running past one post. With the entire beam spliced, it would be logical yet unnerving (no supporting plys) to set the splice at quarterpoint, perhaps with the longer canterevered beam section joined so it rides on top of the shorter cantilevered beam. I agree with the concern of reducing the beams depths at the post where all the shear is. With a joint over the post, may as well butt joint it for full bearing with a top spline to tie. Not as sexy a joint though. Any engineers have a general opinion for a rule of thumb?
|
|
|
|
|
|
|