Previous Thread
Next Thread
Print Thread
Rate Thread
Page 2 of 2 1 2
Re: Attaching sill to foundation #5580 04/29/06 12:09 PM
Joined: Mar 2002
Posts: 1,687
J
Jim Rogers Online Confused
Member
Online Confused
Member
J
Joined: Mar 2002
Posts: 1,687
On one frame we did, with a timber sill over a pt sill we had the concrete guy place 1/2" threaded rod into the concrete looped under a piece of rebar and it was tall enough to come up through the timber sill. We located the rods and bored through holes and lowered the sills down over the threaded rod. Attached nuts and washers and then cut off the threaded rod below the top surface of the sill for the decking to cover it.
Worked ok for us.....

Jim Rogers


Whatever you do, have fun doing it!
Re: Attaching sill to foundation #5581 04/30/06 02:24 AM
Joined: May 2002
Posts: 218
E
Emmett Greenleaf Offline
Member
Offline
Member
E
Joined: May 2002
Posts: 218
Yea Jim,
Still a practioner of prior planning, Good system and simple in execution. Strong too.
deralte

Re: Attaching sill to foundation #5582 04/30/06 03:35 PM
Joined: Dec 2005
Posts: 75
D
Dan F Offline
Member
Offline
Member
D
Joined: Dec 2005
Posts: 75
Just to throw in something to think about--Referring back to Paul's observation that in stick houses the sill is anchored to the foundation with embedded bolts but the framing above that is only toe nailed to the sill. If one anchors timber sills with cast-in bolts or all-thread, and the rest of the frame is joined to the sill with pegs, is there an advantage to using sill anchors with a gazillion pounds of holding power but having the rest of the frame being anchored with pegs that have only a 1/2 gazillion pounds of holding power? Using the weakest link theory I'm inclined to favor a little more emphasis on holding the posts down with one of the aforementioned techniques. Of course it's all overkill....when the frame is done the weight of the bills will hold it in place.

Re: Attaching sill to foundation #5583 05/01/06 01:17 PM
Joined: Mar 2002
Posts: 1,687
J
Jim Rogers Online Confused
Member
Online Confused
Member
J
Joined: Mar 2002
Posts: 1,687
This post is attached to the box sill with pegs:



But again the box sill is just toe nailed to the mud sill. But with the sips attached the the posts and the box sill the post is being held down again.

The real concern is with up lift if you're in a high wind area. If this is the case then proper post to foundation connections, that Paul has mentioned, should be used.

Jim Rogers


Whatever you do, have fun doing it!
Re: Attaching sill to foundation #5584 06/01/06 12:47 PM
Joined: Sep 2005
Posts: 23
J
jroy Offline
Member
Offline
Member
J
Joined: Sep 2005
Posts: 23
Has anyone seen the latest Fine Homebuilding issue? There is a story about a timberframe and I would be curious as to what everyone thought about the connection between the posts and the sill....

Re: Attaching sill to foundation #5585 06/14/06 02:14 AM
Joined: May 2002
Posts: 447
Will Truax Offline
Member
Offline
Member
Joined: May 2002
Posts: 447
A good carpenter is taught to nail his sheathing to the anchored mudsill, the “box” is toed to the “mud” only to straighten it to the snap line.(Jim, thanks for speaking - not so New English) This is part of the straightening
and squaring process, more than it is a structural connection.

Hundreds, maybe thousands of 8d‘s. in shear.

I’d imagine an informed inspector, is looking for just this.

Redundancy is an important part of stick building,

And should not be overlooked in what we do either,


"We build too many walls and not enough bridges" - Isaac Newton

http://bridgewright.wordpress.com/

Page 2 of 2 1 2

Moderated by  Jim Rogers, mdfinc, Paul Freeman 

Newest Members
Bradyhas1, cpgoody, James_Fargeaux, HFT, Wrongthinker
5137 Registered Users
Powered by UBB.threads™ PHP Forum Software 7.7.3
(Release build 20190728)
PHP: 5.4.45 Page Time: 0.164s Queries: 15 (0.052s) Memory: 3.1792 MB (Peak: 3.5814 MB) Data Comp: Off Server Time: 2024-04-27 22:08:46 UTC
Valid HTML 5 and Valid CSS