Hi Mike,

I could probably design and 3D model a whole frame in a day providing a client was able to provide good definition of the project at hand but the process that usually needs to be followed to arrive at a finished design will generally run into weeks when one takes into account design review, client comment and approvals. Production of individual stick drawings takes longer and the addition of detail dimensions to those stick drawings seems to take forever - however this is not really required where the carpenter can layout the frame using scribe or square layout system.

If you want something special (for Alaska) check out http://www.kfhume.freeserve.co.uk

Regards

Ken Hume P.Eng.


Looking back to see the way ahead !