I was wondering about "out riggers". You must be using a purlin system. I am still under the assumption the wedge goes in from the outside, traditionally. Setting the wedge after the floor goes down will still be tricky. How about using a tie at the plate to generate the over hang. Than you won't have the silly wedge. Seems like a lot less work. Tim