We have made some progress on getting the foundation secured and leveled. This is a link to all of the pictures I have taken so far. They are in chronological order. We figured out with a transit that the east sill is down from 2 inches on the north side to 4 inches down on the southeast corner. I still have not been able to figure out how to post the pictures in the message.
http://picasaweb.google.com/cbecker940/BarnRepair#5250047255134498274

Chris