Now I see, thanks for the second video.

so did you take your modeling, look at it from the right perspective, measure the angles, then take the angles to a piece of mdf, label them, then set your bevel off of your mdf?

I think you were right with your decision, imagine the next time when your valley is 5X as long and weighs considerably more. Plus it makes the moment of truth even more fun, when it happens.

Wish I was doing some of that. If you guys are ever in need of someone with some work like this... We could break it all down with some line drawings and just have to calculate lengths.

So are you liking the work so far (besides it being trimber)?