Hello everyone,

I’ve just started to use the TF Rubies by Clark Bremer (thanks by the way) and I have a question before I proceed too far.

I have a pre-existing stone building that I am going to be building a new timber frame roof (the old timber frame roof was destroyed years ago before we purchased it). Question is, I am pretty certain of the roof pitch (I can’t verify the pitch, the building is overseas) however, say I draw the timber frame with Sketchup, and when I get to the property and the pitch of the drawings is off, can I modify the pitch in the drawings and have the timber frame members change with the new pitch (like majic ???) without causing extreme chaos? In a perfect world what I would hope to happen when I change the pitch is that the angles of the joinery and lengths of the members would change, but not fall into shambles, or am I asking too much?

Thanks for your time!