Originally Posted By: timberwrestler
Another consideration, that I can't remember whether Jack addresses, is that you'll need some kind of girt or nailer to at the level of the joists to catch the end of your flooring (assuming there is a loft space). That adds even more joinery at the post/TB location. There are few ways to improve that situation.

timberwrestler, what are the ways you're referring to that could improve that situation?