Thought I'd put up an image of the Panel progression -



Here the time is taken to insert multiple panels at mid span, to use the rigidity this creates to then gently condition and stabilize the Chord Lams into the desired geometry and greater camber typically found towards the end of bridge trusses. This in preps to then scribe the end panels in this required and pre-stressed configuration.


"We build too many walls and not enough bridges" - Isaac Newton

http://bridgewright.wordpress.com/