I ran the numbers through an online beam sizing calculator as a 4x4 EWP spanning 11' with a 1000 load and it failed in bending and deflection.
You need a large timber or some other solution like closer spacing.

To get a timber that will pass at this spacing and span you're going to need at least a 4x7.

Jim Rogers


Whatever you do, have fun doing it!