I worked on a large private job where the entire structure was surrounded by scaffolding, which held up clear span conventional trusses. There was 8' between the top of the timber ridge and the bottom of the truss. A marina crew came in and wrapped the entire building in plastic, and the crew worked through the winter at a comfortable temperature... lots of $$ spent on heat, for sure.


Last edited by bmike; 10/03/13 01:29 AM.

Mike Beganyi Design and Consulting, LLC.
www.mikebeganyi.com