There is one and only one answer to this questions - AIR. You must have at least 1/4" air space to allow clapboard to dry after bulk and diffused moisture enter.

The rate of peeling of surface paint on wood siding is a function of the moisture absorption through the back side. OR water travels any place it can bridge the capillary gap.